Hernandez Consulting & Construction completed the installation of a 106.08 KW photovoltaic system on top of the roof at Bastrop High School, as part of a joint venture with South Coast Solar. The customized racking system spanned existing mechanical equipment and piping. The roof needed to be structurally reinforced to handle the additional weight. The effort was highly coordinated with other trades.