Mississippi River Levee Improvements
 

Location:  Jefferson Parish, LA

Contract Completion:  Projected-December 2015

Project Cost:  $10,492,322

The project is to raise a nine mile stretch of the Mississippi River Levee on the East Bank in Jefferson Parish. The work consists of raising the Levee by removing the access roadway and various permitted vehicle crossings and adding approximately two feet of material. Once the added material is in place, we will replace the access road and permitted vehicle crossings. The entire project will be divided into two segments, beginning with a 4.2-mile stretch that starts at the Orleans Parish line. Following completion of the first stretch, the second 4.6-mile segment from Orchard Road to the St. Charles Parish line will begin. Both segments are projected to take 13 months to complete.

1/2
Wharf Repairs/Improvements 
 

Location:  Kings Bay, GA

Contract Completion:  Ongoing

Project Cost:  $7,701,789.16

The Gulf Building & Hernandez Consulting Joint Venture is currently making repairs to Explosive Handling Wharf 2 (EHW2) and Warping Wharf (WW) at a Naval Submarine Base. Repairs and improvements include reinforced concrete repairs, application of sealant on piles and pile caps in EHW2 above mean low water elevation. Installation of a galvanic & metalizing cathodic protection system on all the WW concrete piles. Installation of anodes and grounding harness system on steel fender piles. Cleaning, coating, and installation of new fender wraps to all steel fender piles. Repairs of mooring hardware foundation and coating and sealing of mooring hardware. Finally, replacement of ladders with galvanized steel ladders throughout facility.

1/4
Project Legacy Hospital

 

Location:  New Orleans, LA

Contract Completion:  Estimated 2015

Project Cost:  $2,469,798.48

 

Hernandez Consulting is working as a subcontractor to Clark McCarthy Healthcare Partners for the construction of the VA Project Legacy Hospital in New Orleans, LA. This is part of a $1 billion medical complex. Our scope includes furnishing and installing all exterior hollow metal doors, all coiling doors, all coiling grilles, all exterior automatic door openers, all dock levelers, all exterior glazed ornamental handrails, all exterior wire-rope handrails, as well as stainless steel elevator cladding. The contract also consists of overhead protection walkways, and construction site fencing.

1/4
Mental Health & Homeless Center Renovation
 

Location:  Dallas, TX

Contract Completion:  March 2013

Project Cost:  $1,256,608.00

This Design/Build project is for an addition as well as a complete interior renovation to a mental health clinic. The existing structure was completely gutted including removal of the fire line and HVAC system. The expansion areas open into the existing area adding 1,500 SF of new office and multipurpose space. The 21 ton HVAC system provides zone controls. Natural light is provided through the use of windows and solar tubes. In total 4,000 SF of clinical space have been brought up to proper HHS standards while providing a comfortable place for patients to receive treatment and feel safe.

HQ:

3221 Tulane Avenue

New Orleans, LA 70119

Tel: (504) 305-8571

Fax: (504) 617-6590

Contracting With Us: contracts@hernandezconsulting.com

 

Employment: Apply Here

Questions & Inquiries: info.nola@hernandezconsulting.com